WysePower will be providing temporary site services to a new mixed-use development site in Bedminster, Bristol.
The services to be provided will include the provision Mains Distribution, accommodation connections, site power, and lighting, and eventually site welfare fit-out.
Andy Roberts, Sales & Estimating Manager – Midlands & South commented: “We have previously worked with Dandara on the enabling phase of the project, which has gained us excellent feedback in regards to our dedicated team of Estimators, Installers on site and Contracts Management approach. This amazing result led us to price for the main works and build the scope required alongside the site team.”
The mixed-use development will consist of 295 apartments, with blocks ranging from three to 16 storeys to include a gym, lounge, and retail space as well as courtyards, private balconies, and roof terraces.