WysePower delivers enabling works at Silicon Roundabout

In 2019, WysePower was appointed to provide a range of electrical services at the Old Street Roundabout regeneration project, one of Central London’s busiest intersections.  

Dubbed “Silicon Roundabout” – owing to the high concentration of tech companies in the area – the Old Street roundabout was an ambitious project to improve safety and traffic flow in the area. WysePower were appointed early in the project, although it was very short notice. The client called on Friday and the team had to be ready on site on Monday.  

It was an unusual project for the WysePower team, who rose to the challenge of providing ad-hoc support over two years and constantly responding to the evolving needs of the site – often with short lead times. 

 “It wasn’t a typical job for us, but it was a great one to be involved with,” said Shaun Byron, Regional Director for London. “We had to be very reactive on the project, planned works had to be carried out in two weeks, which was a lot quicker than we anticipated. 

“However, we worked exceptionally well with Morgan Sindall’s on-site team to get the jobs completed. They were really impressed by our approach and our dedication to go above and beyond. As a result, we were added to Morgan Sindall’s national supply chain and secured additional projects with them across the UK. It was a proud moment for the London WysePower team.” 

Supporting works

Unlike traditional construction sites, the Old Street roundabout was a public-facing environment, which required a great deal of flexibility. This meant that WysePower had to quickly respond to short notice requests ranging from lighting installations, to extra staff on site when required. 

The majority of work involved providing lighting and power solutions to site and temporary cabins, typically during the night. Fit out works were also completed. 

As the site developed, the WysePower team returned to the site intermittently when required. This was to adapt their installations so that it could interface with the public and make it less susceptible to accidental damage or vandalism. 

Working through the challenges

The location of the works was close to Old Street underground station, which meant it was constantly busy. This brought with it some challenges as it was not a controlled environment like more traditional construction sites.  

Site constraints meant the team had to work limited hours at night, typically between 2-4am when it was less busy. Due to the nature of a live site, meticulous Risk Assessment Method Statements (RAMS) had to be completed to ensure health and safety and minimise the risks.  

“The Old Street area is pretty much 24/7, so it’s always busy, continues Shaun. “We had to ensure all our staff were fully trained and complied with the site’s rules and regulations. In addition to night work, there was also trackside works during the day and so we had to attend different inductions and participate in different kinds of training, all of which was provided by our client. 

“It was a great project to be a part of, and we had an excellent working relationship with the client, which made the process much smoother.” 

The main construction work on the Old Street roundabout was completed in 2024, with some minor works completed early 2025. The overall project included new cycle lanes, pedestrian crossings and new entrances to the station and roundabout.