Temporary power and lighting form the backbone of a safe and productive construction site, supporting the build before a permanent grid connection is set up. From powering tools and equipment to providing reliable task lighting and supporting commissioning activities, these services keep the project running from day one to the permanent handover. In this guide, we’ll explore the purpose of temporary services and the key considerations when planning safe and efficient installations of temporary lighting and power for data centre construction.
Why data centre construction needs a temporary power and lighting phase
Installing temporary lighting and power solutions is essential because construction begins long before a permanent electrical infrastructure on a data centre is set up. From the beginning, contractors need to have a safe and reliable power supply for tools, plant, temporary HVAC systems and welfare facilities. They also require robust task and access lighting to ensure work can safely progress across the site including internal areas, access routes and stairwells.
As the project develops over different phases, the temporary electrical installations adapt to fit the programme, providing power and lighting throughout the duration of the project. Having this flexibility helps maintain productivity and keeps work moving without waiting for the permanent power supply to be energised.
Data centre construction projects have tight deadlines, which means any interruptions to temporary power can have a significant impact on schedules. A detailed, tailored plan helps maintain safety and keeps the project running efficiently from early mobilisation through to final commissioning.
What temporary power needs to cover on a data centre site
Temporary power on a data centre build typically covers a range of jobs across the site including:
- Providing power via temporary distribution boards for tools and small plant
- Welfare unit power
- Power to cranes
- Task and area lighting
- Security and perimeter lighting
- Load banks for pre-commissioning testing
The types of temporary lighting and power required on site typically depends on the phase of the project.
It’s worth mentioning that for safety, the Health and Safety Executive (HSE) states that all standard portable tools and task lighting should be stepped down to 110V using transformers on site.
How this fits into the wider data centre construction programme
These temporary services play a crucial role in supporting the data centre construction programme, which typically evolves as the site progresses. During early site mobilisation, power is needed for welfare facilities, tools, plant and temporary HVAC, while flexible lighting solutions enable productivity across internal work areas, stairwells and access routes. As the project progresses, temporary power and lighting infrastructure evolves to support a larger workforce, testing activities and phased commissioning.
| Phase | Power/Lighting Needed | Typical Equipment Used |
|---|---|---|
| Enabling works | Temporary Builder’s Supply (TBS) for site set-up and welfare, small tools, site lighting | MDU, lighting towers |
| Shell-and-core | 230-240V mains supplies for welfare and security, heavy tools and lighting, heavy plant | SDUs, site/task lighting, cranes (if required) |
| Temporary services | Temporary M&E services, HVAC, fire-safety systems | SDUs, temporary fire alarms |
| MEP installation and commissioning | Load Bank testing, standby power for critical systems | Load banks |
| Permanent handover | Wind-down of temporary services | N/A |
This is why temporary services are vital to the construction programme. They support the site before permanent MEP systems are live. Incorporating a fully tailored temporary power and lighting scheme into the construction programme at the initial stage ensures contractors can improve safety, maintain productivity and reduce costly delays.
Specifying temporary power and lighting correctly
Ensuring the correct specifications for temporary power and lighting is crucial in preventing significant downtime, avoiding thermal disruptions and assuring regulatory compliance. There are several practical considerations to take into account during the planning stages:
- Load calculations: future loads should also be accounted for and not just current demands as loads will increase as the project develops.
- Power redundancy: set up an N+1 system. Work out what the site’s requirements are and then add a spare unit on top so that if a module or generator fails, the additional unit will continue to distribute power. Additionally, a 2N system design, where a complete infrastructure is duplicated, provides an independent secondary set-up designed to prevent downtime and ensures total fault tolerance.
- Scalability: ensure equipment can be added or reconfigured as the site’s footprint and complexity increases.
- Compliance with safety standards: all work must be in line with current safety standards and regulations.
How WysePower supports this phase
WysePower works with contractors throughout this vital stage of the programme to ensure safe, efficient and compliant temporary lighting and power for data centre construction. Our services include:
- The design and installation of temporary power distribution
- Access, task and safety lighting solutions
- Plumbing, heating and water management solutions
- Installation of intruder alarm systems
- Energy monitoring systems and fuel management
Our team and equipment can be rapidly deployed on site and respond quickly to the evolving needs of your site. For example, when WysePower supported the delivery of the Yondr data centre campus in Slough, the team provided flexible temporary power solutions throughout the construction programme. The team provided continuous support and responded to changes to the brief quickly, to meet the rapidly changing demands of the site. This helped the client maintain progress, minimise delays and costs and ensure critical works kept moving safely and efficiently.