WysePower has been chosen to provide a host of temporary site services for an exciting new residential development in Wembley.

Situated in the heart of north-west London’s iconic, cultural hotspot, the Barratt London development will include a collection of 222 one bedroom, 188 two bedroom and 46 three bedroom flats, as well as retail and commercial units, landscaped gardens and residential parking.

A wide range of temporary water and electrical services will be supplied on site, which includes, but not limited to three phases of welfare, three tower crane supplies, five hoist supplies, three silo supplies, one wheel wash and eight CCTV supplies. We will also be providing 110v power distribution and lighting to five blocks.

Callum Jellinek, Business Development Manager, commented: “WysePower’s design utilised the most efficient sub-distribution routes, which allowed us to provide the most cost effective solution with no disruption to the programme. This made us the ideal temporary site solutions provider for the job.”